这座多层建筑你看不到水泥砖墙, 只有高品质的木材(11)

Working with CLT enabled several important aspects in the project: It made it possible to create a spacious hallway and atrium space with a lot of light realized in an energy efficient manner as a semi-warm space. The insulating qualities of massive wood allow for controlling the temperature of the individual units independently. The use of prefabricated volumetric CLT modules made it possible to integrate the piping for heat water electricity and ventilation in the wall structure in the hallway making it easily accessible for maintenance. This arrangement also allows for an efficient organization of the plan.

CLT模块是在离现场不到两小时车程的当地工厂预制的 。 预制模块的使用让每座建筑的施工时间减少至6个月 , 这也减少了材料暴露在空气中的时间 , 从而让整个项目有着更高质量的完成 。

The CLT modules are prefabricated in a local factory less than two hours away from the site. The use of prefabricated modules made it possible to cut the construction time on site down to six months per building and to reduce the exposure to weather conditions making it possible to achieve a higher quality in the end result.

特别声明:本站内容均来自网友提供或互联网,仅供参考,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。